- 60 MW plant located in Aizawl, Mizoram
- The Tuirial hydropower project has been built on Tuirial River, a tributary of Barak River.
- It was first cleared in 1998, by the then Prime Minister Atal Bihari Vajpayee.
- It made Mizoram third power-surplus state in North-East after Sikkim and Tripura.
- Why important? Inaugurated by PM